KOREA
HQ · Design · Quality
- Owns group design & quality standards
- Euroform & gang form production, panel refurbishment
- 150,000 m² monthly capacity
FORMWORX KOREA CO., LTD. · Eumseong
Build faster. Finish finer. Use longer.
Aluminium formwork, gang form and Euroform — designed, manufactured and supported to one standard across Korea, Vietnam and India, and physically assembled before it ships.
KOREA · VIETNAM · INDIA
A building rarely needs only one system. We make all three in our own plants, so we can supply, combine and service what your site actually requires.

Aluminium formwork system
Walls, slabs, beams, columns and stairs cast in one cycle — a fair-faced concrete finish with no plastering.
200+ reuses · 6-day floor cycle · A6061-T6 alloy

Exterior climbing formwork
Wall plate and working cage in one unit, craned floor to floor — no external scaffolding.
Shop-fabricated · integrated platforms

Steel-frame plywood formwork
Standard panels, in-corners and out-corners, plus refurbishment of used panels to service condition.
6,000 sets / day · 3,000 sheets / day refurbished
“What we promise a client, we deliver. Drawings are checked before material is cut. What we ship has been physically assembled at least once. Someone answers the phone when a site calls.”Kim Sun Hong, CEO, FORMWORX CO., LTD.
Lighter and stronger than Euroform, AL-Form withstands lateral pressure floor after floor and casts the whole structure in a single cycle.

One investment, 200+ floors
6 days per floor vs. 8–9 with Euroform
Structural rigidity for high-rise walls
Scrap value at end of life · zero waste
The same tower, two systems. Every panel of an AL-Form set has exactly one position, locked by the layout drawing — which is why it finishes cleaner and repeats faster.
| Item | Euroform | AL-Form |
|---|---|---|
| Reuses | 40–60 | 200+ |
| Concrete finish | Usually needs plastering | Fair-faced — minimal follow-up work |
| Cycle per floor | Typically 8–9 days | 6 days |
| Site handling | Plywood + timber — heavy, easily damaged | One-person handling — light and reusable |
| Waste | Plywood face — consumable | Aluminium — 100% recyclable |
| Striking | Unstable form removal | Pin & wedge — safe striking |
How aluminium formwork moves the programme forward — the standard pace from the 3rd–4th floor, once crews know the layout.



Cycle comparison — 30 floors
About 30% shorter programme — roughly 75 days saved on a 30-storey tower.
Every form set is engineered, produced and physically verified before dispatch. The mock-up is where drawings become real — problems are solved before they reach the site.

| Shell drawing review | 5 days |
| Non-standard lead time | 2 weeks |
| Mock-up verified before dispatch | 100% |
| Non-standard shape types | 20 |
A technical supervisor runs the first assembly cycles with your crew and hands the layout logic over to site staff. High-wear parts ship with 10–20% spare quantity — so a single pin never stops a site.
A Samkwang–Formworx joint venture — each location with a clearly defined role, connected as one network. In India we chose local manufacturing over export, so lead time and accountability stay near the site.
HQ · Design · Quality
FORMWORX KOREA CO., LTD. · Eumseong
Production · Design office
FORMWORX VINA CO., LTD. · Haiphong
Local production · Sales
SAMKWANG FORMWORX INDIA PVT. LTD. · Greater Noida

200+ cumulative projects. A selection of key supply references by region.
Three countries, one team — contact the location nearest your project.
Korea · Head office · Design · Manufacturing · Sales
1266 Wonjung-ro, Maengdong-myeon, Eumseong-gun,Vietnam · Plant · Manufacturing · Sales
National Road 5A, Km 35+600,Vietnam · Design centre · Design & Engineering
19F, Mixed-use Building, 169 Nguyen Ngoc Vu,India · Plant · Design · Manufacturing · Sales
Plot No. 1, Ecotech-X, Greater Noida,Send drawings or questions to formworx@formworx.kr — we reply from the location nearest you.
Email us